News:

         
Welcome to FJowners.com


It is the members who make this best place for FJ related content on the internet.

Main Menu

timing advance/polish/kickstand weld

Started by fudge12, September 19, 2016, 06:42:06 PM

Previous topic - Next topic

fudge12

So today I found myself with a bit of free time so I figured I'd give fudge12 a bit of love. The other day I ran my hand across the gas tank and it was not just dirty but gritty.  Ugh.  Only way to fix that was to spend some time with a clay bar, followed by rubbing compound, followed by polishing compound, followed by wax.  Looks much better now, whiter whites and brighter brights and all.  Since that took less time than I expected, I went ahead and slotted my rotor to advance the timing a bit.  Simple like pie, but haven't ridden it yet to see if it does anything.  Finally I decided to build up the metal on the kickstand a touch.  When the kickstand is retracted, it has a limit stop that controls how high it retracts.  mine was a bit worn and the kickstand was almost touching the left footpeg.  Since I decided I'd probably be lowering the footpegs soon, it seemed like a good time to adjust this.  Also simple like pie, remove the bolt holding the kickstand on, remove the kickstand, wire brush off the nasty and lay a nice fat bead of weld on the contact area.  Once it cooled I ground it down to fit, and repeated till I got the kickstand where I wanted it.  Now I have plenty of room under the footpeg.
1987 FJ1200
2008 Versys
2002 VFR800
2002 Buell Blast
1986 Honda CM400C
~Dnepr MT-16
1975 Honda GL1000
The best you've ridden is the best you know.
I'm like Netflix, but with bikes.