This is as far as I got so far:
(http://i859.photobucket.com/albums/ab154/firehawk068/FJ1200%20Wheel%20Project/CIMG4298.jpg)
(http://i859.photobucket.com/albums/ab154/firehawk068/FJ1200%20Wheel%20Project/CIMG4300.jpg)
(http://i859.photobucket.com/albums/ab154/firehawk068/FJ1200%20Wheel%20Project/CIMG4301.jpg)
(http://i859.photobucket.com/albums/ab154/firehawk068/FJ1200%20Wheel%20Project/CIMG4304.jpg)
(http://i859.photobucket.com/albums/ab154/firehawk068/FJ1200%20Wheel%20Project/CIMG4307.jpg)
(http://i859.photobucket.com/albums/ab154/firehawk068/FJ1200%20Wheel%20Project/CIMG4308.jpg)
I have to take some more measurments before I go any further as to get the right machine-work done on the cushdrive, and caliper bracket. I'll try and take as detailed notes as I can along the way.
Keep the pics coming, we love to watch!
Yes, I have a 16" tire that needs "disassembly" too. Waiting for a good wind from the west so the fire warden can't zero in on my driveway.
I used my air cutoff wheel, and a prybar on the front FZR1000 wheel before I took it to the powder coater's.
The tire ended up in my dumpster at work somehow. :unknown: